Senawang Komuter station

Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Seremban
towards Batu Caves
Batu Caves–Pulau Sebang Line Sungai Gadut

The Senawang Komuter station, is a Malaysian commuter rail station serving as a halt on the KTM Komuter Seremban Line. It was constructed as part of the double tracking and electrification project between Seremban and Gemas, undertaken by IRCON International, a subsidiary of Indian Railways. The station began revenue service on 14 May 2011.[citation needed]

Location

The map of Senawang station.

The station serves Senawang and is the closest station to some of Seremban's outer suburbs such as Paroi, Rahang, Forest Heights and Taman Seremban Jaya down south. The station is located near the three-way intersection of the North South Expressway's Senawang Exit, the Federal Route 1 and Persiaran Senawang 1.[1]

References

  1. ^ "Senawang KTM Station – klia2.info".

External links

Wikimedia Commons has media related to Senawang Railway Station.
  • KL MRT and Komuter Integration
  • v
  • t
  • e
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • B1
Phase 1

Opening 2025
Phase 2
Stations and services in italics are planned or under construction


Stub icon

This Malaysian railroad station-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e