Segambut 2 Komuter station

Train station in Kuala Lumpur, Malaysia
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Kepong Tanjung Malim–Port Klang Line
(if station is completed)
Segambut
towards Port Klang

The Segambut 2 Komuter Station is an infill commuter train station that will serve the suburbs of Segambut and Jinjang Selatan in Kuala Lumpur, Malaysia.[1][2] It will be served by the Port Klang Line of the KTM Komuter service that forms part of the Klang Valley Integrated Transit System. The station will include facilities such as park and ride, disabled-friendly utilities, ticket kiosks, restrooms, elevators and taxi stands.

Background

In August 2023, Railway Assets Corporation (RAC) and IDP Industrial Development Sdn Bhd had signed an agreement with UOA Development Berhad to develop a new railway station along the KTM line, while the former will undertake the construction of it to further integrate with its existing development.[3] The signing ceremony was witnessed by Transport Minister Anthony Loke and Segambut's MP Hannah Yeoh.[4][5] Previously, the land was first earmarked in 2016 to be constructed as a KTM station along with the development of UOA's United Point Residence.[6]

The station is expected to be operational by November 2025. Once completed, it will serve the surrounding neighborhoods of Taman Cuepacs, Taman Sri Segambut, Taman Segambut Aman as well as Taman Sri Sinar and will be directly connected to United Point via an overhead bridge.[7]

References

  1. ^ "Anthony Loke: Construction of Segambut 2 Railway Station catalyst for development of surrounding area". Malay Mail. 2023-08-24. Retrieved 2024-03-28.
  2. ^ "Plan for Taman Cuepacs KTM station awaits final approval". The Star. Retrieved 2024-03-28.
  3. ^ adlina (2023-09-15). "Dari Kesesakan Ke Kemudahan: Janji Stesen Keretapi Segambut 2". CIDB HQ (in Malay). Retrieved 2024-03-28.
  4. ^ SUKAIMI, SITI A'ISYAH (2023-08-24). "RAC tawar 10 tapak tanah kereta api untuk dibangun". Kosmo Digital (in Malay). Retrieved 2024-03-28.
  5. ^ "Segambut 2 Station to boost development and connectivity - Citizens Journal". 2023-08-27. Retrieved 2024-03-28.
  6. ^ "UOA Development sales beat expectations". The Edge Malaysia. Retrieved 2024-03-28.
  7. ^ "Stesen Kereta Api Segambut 2 dijangka siap November 2025". Sinar Harian (in Malay). 2023-08-24. Retrieved 2024-03-28.

External links

  • KTMB routes
  • v
  • t
  • e
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • B1
Phase 1

Opening 2025
Phase 2
Stations and services in italics are planned or under construction