Ampang Park LRT station
Preceding station | Following station | |||
---|---|---|---|---|
Damai towards Gombak | Kelana Jaya Line | KLCC towards Putra Heights |
Ampang Park LRT station is a light rapid transit (LRT) station in Kuala Lumpur that is served by RapidKL's LRT Kelana Jaya Line. The LRT station is the last underground station on the Kelana Jaya Line along Jalan Ampang, near the Jalan Tun Razak intersection, before the line heads above ground again at Damai LRT station.
The LRT station is close to Citibank's Malaysian headquarters, as well as the US Embassy, the Singapore High Commission, the Canadian High Commission, and the British High Commission which are all located in the area of Jalan Tun Razak, known as "Embassy Row". It named after and located beside the former site of the first Malaysian shopping centre, Ampang Park Shopping Centre.
This LRT station, despite sharing the same name, is not integrated and not to be confused with the separate Ampang Park MRT station, which is serviced by the MRT Putrajaya Line instead. Paid zone-to-paid zone integration was once proposed but not constructed at the moment. Passengers are required to tap out from one station, exit the station at ground level and walk along a covered walkway to the entrance of the other station to transfer between the lines.
History
This station was opened on 1 June 1999, as Phase Two of the PUTRA LRT system, which ran from Masjid Jamek to Terminal PUTRA (Gombak). The exterior building design of the Ampang Park LRT underground station was done by NEUformation. The station shape, created as a series of inclined glass planar surfaces, implies motion in keeping with the concept of the LRT system as a future mode of transit.[1]
Layout
The station consists of three levels, with the entrance on ground level while the ticketing area, concourse and platforms are underground. Similar to all Kelana Jaya Line underground stations, the Ampang Park station features an island platform sandwiched between two railway tracks for each direction.
Paid-to-paid interchange between the Kelana Jaya Line and the Putrajaya Line, both underground, was planned for Ampang Park station; the integration was scrapped in favour of an out-of-station interchange due to cost-cutting measures.[2] Passengers will have to tap out from one line, resurface to ground level, and enter the other underground station when changing between the two lines with a 7 minutes walking time between platforms.
G | Street Level | Jalan Ampang, Bus Hub, Citibank, Intercontinental Hotel, Walkway to Ampang Park MRT station |
C | Concourse | Faregates, Ticketing Machines, Station Control, Shops |
P | Platform 1 | Kelana Jaya towards KJ1 Gombak (→) |
Island platform, Doors will open on the right | ||
Platform 2 | Kelana Jaya towards KJ37 Putra Heights (←) |
Exits and Entrances
Kelana Jaya Line station | ||
Entrance | Destination | Picture |
---|---|---|
North | Street level access. North side of Jalan Ampang Ampang Park MRT station (Entrance B) | |
South | Street level access. South side of Jalan Ampang Access to Jalan Tun Razak Pedestrian Walkway to Intermark Mall, The LINC |
See also
References
External links
- Ampang Park LRT station - mrt.com.my
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (provisional)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (provisional)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (provisional)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
3°09′35″N 101°43′07″E / 3.15972°N 101.71861°E / 3.15972; 101.71861