Muhibbah LRT station

3°3′43.4″N 101°39′45.0″E / 3.062056°N 101.662500°E / 3.062056; 101.662500

Preceding station Following station
Awan Besar
towards Sentul Timur
Sri Petaling Line Alam Sutera

Muhibbah LRT station is a Light Rapid Transit station at Kampung Muhibbah, a village about 21 km south of Kuala Lumpur, the capital of Malaysia.[1][2]

Muhibbah station is the nearest station for PPR Kampung Muhibbah and Parklane OUG Service Apartments, although it is a 1.0 km walking distance thru PPR Kampung Muhibbah Block D. It is possible to walk from Muhibbah station to the next station, which is Awan Besar LRT station.

It is operated under the Sri Petaling Line. Like most other LRT stations operating in Klang Valley, this station is elevated.

Design and layout

L2
Side platform, doors will open on the left
Platform 1 Sri Petaling Line towards  AG1  SP1  Sentul Timur and  AG18  Ampang via  AG11  SP11  Chan Sow Lin (→)
Platform 2 Sri Petaling Line towards  SP31  Putra Heights (←)
Side platform, doors will open on the left
L1 Concourse Faregates, ticketing machines, station control, escalators and elevators to street levels and car park.
G Street Level Handicapped friendly ramp available. Street entrances are available from both directions of Jalan 4/155, PPR Kampung Muhibbah.

Bus services

Route

No.

Operator Origin Destination Via Frequency

(Minutes)

Operating

Hours

Note
651 Rapid KL Muhibbah LRT Station Pearl Point Awan Besar 20 6.30 AM to 11.30 PM Starting point, reverse direction will stop at Awan Besar LRT Station

Gallery

  • Concourse, 2023
    Concourse, 2023
  • Concourse, 2023
    Concourse, 2023
  • Entrance A, 2023
    Entrance A, 2023
  • Entrance B, 2023
    Entrance B, 2023
  • Platform 1, 2023
    Platform 1, 2023
  • Platforms, 2023
    Platforms, 2023

References

  1. ^ "New Ampang LRT line to begin operations in 2015". Astro Awani. February 27, 2014.
  2. ^ "Month-long free ride at four new LRT stations - Prasarana". Astro Awani. October 28, 2015.

External links

  • Muhibbah LRT Station - KL MRT / LRT Integration
  • https://goo.gl/maps/G7gThG5pJPv - Google Maps
  • v
  • t
  • e
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • B1
Phase 1

Opening 2025
Phase 2
Stations and services in italics are planned or under construction


Stub icon

This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e