Longbridge Weir Hydro

52°55′22″N 1°28′15″W / 52.92278°N 1.47083°W / 52.92278; -1.47083Commission date2012Owner(s)Derby City CouncilThermal power station Turbine technologyHydroelectricPower generation Units operational230kw/h
[edit on Wikidata]

Longbridge Weir Hydro Power House is the name given to a hydro-electric dam built on the River Derwent in the City of Derby.

The project was completed by Derwent Hydro[1] in 2013 at a cost of £1.7 million. The station primarily exists to power the city councils offices, however, surplus energy is sold back to the National Grid.[2]

References

  1. ^ "Consultancy and Design". Derwent Hydro. Archived from the original on 19 December 2013. Retrieved 19 December 2013.
  2. ^ "Derby's Derwent hydroelectric power plant opens". BBC News. 19 May 2013. Retrieved 11 September 2013.
  • flagEngland portal
  • flagUnited Kingdom portal
  • iconTransport portal
  • iconRenewable energy portal
  • v
  • t
  • e
Electricity generation in the East Midlands
Power stations
Biomass
Closed
  • Cottam
Coal
Active
  • Ratcliffe-on-Soar
Closed
Gas
Active
Proposed/future
Hydro
Active
Incinerators/waste
Wind
Active
Proposed/future
Organisations


Stub icon

This article about a United Kingdom building or structure is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e