Ashgabat Monorail

Monorail in Ashgabat, Turkmenistan
Ashgabat Monorail
Overview
LocaleAshgabat, Turkmenistan
Transit typeMonorail
Number of lines1
Number of stations8
Operation
Began operation2016
Operator(s)Intamin
Technical
System length5.2 kilometres (3 mi)
Top speed80 km/h
System map

The Ashgabat Monorail (Turkmen: Aşgabat monorels ýoly) is a monorail line on the Olympic Village in Ashgabat, Turkmenistan.[1] Construction started in 2012, by Turkish construction company Polimeks[2] and completed in 2016.[3] It uses a 25-meter rolling stock by Intamin.[4]

References

  1. ^ "Ashgabat Monorail Construction June 2014". monorails.org. Archived from the original on 2016-05-07. Retrieved 2016-04-27.
  2. ^ "Туркменистан: золотой век". turkmenistan.gov.tm. Archived from the original on 2016-11-20. Retrieved 2016-04-27.
  3. ^ turkmenportal. "Президент Туркменистана совершил рабочую поездку в Ахалский велаят и по столице | Политика". Туркменистан, интернет портал о культурной, деловой и развлекательной жизни в Туркменистане (in Russian). Retrieved 2023-04-14.
  4. ^ "Ashgabat". intaminworldwide.com. Archived from the original on 2016-04-19. Retrieved 2016-04-27.

External links

  • Ashgabat Monorail by Intamin
  • Olympic Complex - Polimeks Archived 2022-05-26 at the Wayback Machine
  • v
  • t
  • e
Turkmenistan Transport in Turkmenistan
Urban rail
  • Ashgabat Monorail
Defunct
Trolleybuses
  • Ashgabat
Türkmendemirýollary (rail)
Tourist BusMajor terminals
  • Central Asia transit: (Azerbaijan) <= Turkmenistan
  • Uzbekistan
  • Kazakhstan => (Xinjiang,Russia)
  • Southern Corridors: Tajikistan
  • Kyrgyzstan
  • Iran <= Afghanistan => (Pakistan)


Stub icon

This monorail-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e
Stub icon

This Turkmenistan-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e